LC-B30 Backhoe Loader
LC-B30 Backhoe Loader. 7.64-ton backhoe loader with 2,500 kg loader capacity, 4,082 mm digging depth and 75 kW power.

The WZ30-25 combines a 1.2 m³ loader bucket with a 0.3 m³ backhoe for loading, excavation, trenching and general construction duties.
A 75 kW CYD YC4A105Z-T20 diesel, YJ280 torque converter and fixed-shaft power-shift gearbox provide two forward and two reverse gears.
Applications
- General construction
- Trenching and utility work
- Material loading
- Road maintenance
- Site preparation
2,500 kg loader capacity
The 1.2 m³ front bucket delivers 38 kN breakout force and a 2,742 mm dumping height.
Deep backhoe reach
The 0.3 m³ backhoe reaches 4,082 mm deep with 190° swing and 46.5 kN bucket force.
75 kW drivetrain
The 3.9 L engine drives through a YJ280 torque converter and a 2-forward / 2-reverse power-shift gearbox.
Measured work cycles
Specified loader cycle times are 5.4 seconds lift, 3.1 seconds lower and 2.0 seconds dump.
Dimensions & Loader
| Overall Dimensions | 5,910 × 2,268 × 3,760 mm |
|---|---|
| Operating Weight | 7,640 kg |
| Wheelbase | 2,250 mm |
| Minimum Ground Clearance | 300 mm |
| Loader Bucket Capacity | 1.2 m³ |
| Loader Lifting Capacity | 2,500 kg |
| Loader Breakout Force | 38 kN |
| Bucket Dumping Height | 2,742 mm |
| Bucket Dumping Distance | 1,062 mm |
Backhoe & Hydraulics
| Backhoe Bucket Capacity | 0.3 m³ |
|---|---|
| Maximum Digging Depth | 4,082 mm |
| Backhoe Swing Angle | 190° |
| Bucket Digging Force | 46.5 kN |
| Arm Digging Force | 31 kN |
| Hydraulic System Pressure | 12 MPa |
| Lift / Lower / Dump Time | 5.4 / 3.1 / 2.0 s |
Engine & Drivetrain
| Engine Model | CYD YC4A105Z-T20 |
|---|---|
| Rated Power | 75 kW / 2,200 rpm |
| Maximum Torque | ≥410 N·m / 1,500 rpm |
| Displacement | 3.9 L |
| Torque Converter | YJ280 |
| Transmission | Fixed-shaft power shift |
| Gears | 2 forward / 2 reverse |
| Maximum Speed | 22 km/h |
| Tires | 16/70-20 |
Send LICH your job, destination and attachment needs: the engine, attachments and full configuration are written into your quotation, and certificates are supplied with the order documents.